Bids requested for channel repair
/Bids are now being requested for furnishing all labor, equipment materials and incidentals necessary to complete repair of the outlet channel of Willow Creek Dam. The Project site is 1.5 miles West and 1.25 mile South of Pierce, Nebraska. The construction will involve excavation and earth fill necessary to reshape the outlet channel embankment, salvaging topsoil, seeding and mulching the topsoil, installation of filter fabric and installing riprap on top of the installed filter fibric. There will be incidental work along with the prescribed pay items of work. The planned work is shown on drawings attached to this project manual. Other related items shall be furnished and installed by the Contractor.
Proposals will be opened at 1:00 P.M. on July 11, 2023 . Project work shall be completed by March 15, 2024.
Specifications and plans for the work can be examined and obtained from the Lower Elkhorn NRD at 1508 Square Turn Boulevard in Norfolk, Nebraska.